Cyber Liability Insurance for NAICS 238910
CYBRanked reasons a business in NAICS 238910, Site Preparation Contractors, needs Cyber Liability coverage. Each reason is specific to how this industry actually loses money, and ends with the question to ask before the objection comes up.
- 01
Utility locates are what stop you hitting a live line.
- Locate requests are submitted and returned electronically before any excavation.
- Tickets expire and must be documented for the dig.
- Digging on a missing or expired locate is how gas lines explode.
- ASK
- How do you submit and record utility locate tickets before excavation?
- 02
Machine control models control the finished grade.
- Survey models load into dozers and excavators and control the blade automatically.
- The model becomes the grade once the machine is running.
- A wrong model moves thousands of yards to the wrong elevation.
- ASK
- How are your survey and machine control models loaded and verified?
- 03
Erosion control and permits carry inspection requirements.
- Stormwater permits require inspections, records, and reporting during construction.
- Regulators inspect against those records after every rain event.
- Violations carry penalties and can stop work on the site.
- ASK
- What stormwater inspection records does your permit require?
1–8 policy ← → move ESC home